The FineLine workers, who put in the countertops, had to negotiate a treacherous walk through the forms placed for the concrete pour, then climb up onto the porch to get in through the front door (see photos below). Entry through the garage wasn't possible, because the garage had been used as a paint shop and all the garage doors and openers were taped and wrapped.
Sunday, November 28, 2010
Weather Delays Flatwork
Snow hit the Tri-Cities the week of the 22nd and is still here, the Sunday after Thanksgiving, delaying pouring the concrete driveway, walkway, and sidewalks.